P/M Clutch Hub
Features:
1. High Strength
2. Multi-Step Powder Compaction
3.Comparison of Strength (Rib. Tooth)

Fracture Load at Rib (ton)

Fracture Load at Tooth (kg)

11.0

6.0

900

500

1000

10

500

5

D-40

H-110

D-40

H-110

Engineered Sintered Components Company
250 Old Murdock Road
Troutman, NC 28166
704.528.7500
704.528.7529 Fax
E-mail: webmaster@engsin.com

[Home] [Global Overview] [Product] [Employment]